The NG is planning to build a new certified airport to replace the existing airstrip at Nain.

The three main components of the Project are as follows:
– The Airport, which refers to the proposed terminal, equipment maintenance hangar, food cold storage/freezer building, apron, groundside parking and related facilities, as well as an area of 1,300 m2 set aside for potential future development.
– The Runway, a new airstrip approximately 1,830 m (6,000 ft) in length and 30 m (100 ft) in width, exclusive of the apron (maneuvering areas).
– The Access Road, a new road approximately 13 km long joining the Airport to Nain. The New Nain Airport will operate 24 hours a day, seven days a week, to serve the local population and will be able to serve as the emergency response centre for the region.

For more information, please visit:

12599942-RPT-New-Nain-Airport-Project-Registration_compressed