Thank you for your interest in preparing a proposal submission for the Battery Energy System Storage (BESS) component of the Nain Wind Micro Grid Project (the Project). The Owner is a partnership between the Nunatsiavut Government and independent power producer, Natural Forces. The Project is structured as a multi-contract project led by the Owner’s project company – Nunatsiavut Clean Energy Corporation. The successful Respondent will work under the Owner and Owner’s Representatives for the Project.

To view Instructions to Respondents, please download: NWMG BESS RFP – Schedule 0 – Request for Proposals Instructions to Respondents V_01

To be considered, submit one (1) original proposal as outlined in Schedule 3 – Proposal Form, including the requirements outlined in Schedule 2 – Owner’s Statement of Requirements. Each item, at a minimum, on the Proposal Form shall be completed. Incomplete proposals may not be accepted.

To access full RFP package, please reach out to the Natural Forces Representatives mentioned below.

The due date for submissions is April 21, 2026 by 17:00 hrs NDT.

RFP submissions are to be submitted in PDF format by email to:

Neil Heffern
nheffern@naturalforces.ca

Thomas Tzagarakis